Delivery and Installation
From Port to Your Workshop — Turnkey
We handle delivery to any region of Russia and carry out professional installation in strict accordance with all technical and production requirements. Our goal is to get your machine up and running as quickly and efficiently as possible.
Equipment Delivery
Flexible Delivery Terms
We operate under all major international trade terms: DDP, DAP, FCA, and others. The most popular option is DDP (“Delivered Duty Paid”), where you receive the equipment turnkey with no additional costs or hassle.
- • Sea and air freight from China, Taiwan, Japan, South Korea, and Europe
- • Rail and road transport across Russia
Lead Times and Tracking
Average delivery time from the port of origin to your warehouse is 30–60 days, depending on the route and transport method. Express air delivery is available for urgent shipments.
- • Customized delivery schedule aligned with your production plan
- • Online cargo tracking at every stage
- • Full-value cargo insurance
Installation and Commissioning
Machine installation is more than just unloading and plugging into power. It’s a comprehensive process that directly affects the machine’s accuracy, reliability, and service life. Our certified engineers perform all work in strict compliance with the manufacturer’s technical specifications.
Installation Steps:
- • Foundation inspection and site preparation
- • Unloading and moving equipment using specialized machinery
- • Geodetic alignment and leveling of the machine
- • Connection to power, pneumatic, and cooling systems
Commissioning Works:
- • Full system and component run-in
- • CNC and measurement system calibration
- • Test machining of sample parts
- • Handover with acceptance certificate
Special Conditions
Oversized Equipment
For machines weighing over 10 tons or exceeding 3 meters in size, we develop a custom logistics plan: selecting reinforced transport platforms, coordinating routes with road authorities, and arranging escort vehicles if necessary.
Remote Regions
Delivery and installation in hard-to-reach areas (Far East, Siberia, Arctic) require a specialized approach. We partner with trusted logistics providers experienced in extreme climatic conditions.
Urgent Shipments
In case of production emergencies, we can arrange express delivery of critical components or backup equipment within 7–14 days, including customs clearance and door-to-door delivery.
What We Need From You to Organize Delivery and Installation:
- • Full delivery address with precise coordinates and contact details of the responsible person
- • Access route and gate specifications (width, height, turning radius)
- • Availability of lifting equipment on-site (crane, forklift)
- • Prepared foundation (if required) with strength certification
- • Availability of qualified personnel for training
- • Preferred dates for commissioning works
Need a specialist consultation?
Our experts will help you choose the right equipment tailored to your production requirements and budget. Submit your request, and a specialist will contact you shortly.